01 — Renovation Services

Renovation Services
in Islamabad & Rawalpindi

Your Space, Rebuilt Better.

Full-scale home and commercial renovations — kitchens, bathrooms, full floors, structural upgrades. Minimum project scope applies.

Minimum Project Value: Rs. 25 Lakh
Modern kitchen renovation completed by DevPro Renovation Services in Islamabad
02 — What We Renovate

What We Renovate.

We rip out, rebuild and refit complete spaces — never just a wall of paint. From a single luxury kitchen to a full home gutted to the slab, our team runs the whole job under one BOQ. Choosing finishes? Our guide to A-grade construction materials in Pakistan helps you spec the job, and you can get a construction cost estimate to anchor your budget.

  • Full home renovation A-to-Z
  • Kitchen remodelling & upgrades
  • Bathroom renovation & tiling
  • Full floor renovation & flooring
  • Structural changes & extensions
  • Commercial space renovation
A Quick Note On Scope

Built for Complete Transformations.

DevPro specialises in full-scope renovation projects, with a minimum scope of Rs. 25 Lakh. We focus on complete transformations — homes, kitchens, bathrooms and commercial spaces, end to end.

We do
  • Full home renovations
  • Complete kitchen rebuilds
  • Bathroom + tiling overhauls
  • Commercial fit-outs
  • Structural extensions
We don't
  • Single-room repainting
  • Tap or fixture-only swaps
  • Spot tile replacement
  • Sub-Rs. 25L scopes
  • Single-shop fit-outs
03 — Renovation Types

Three Tracks. One Quality Standard.

Match the scope to your space — every track runs the same BOQ, the same daily updates, and the same one-year warranty.

Home Renovation

Complete top-to-bottom home transformations. Kitchen, bathrooms, flooring and more.

Typical Timeline
2 – 4 months

Commercial Renovation

Office fit-outs, retail renovations and commercial space transformations.

Typical Timeline
4 – 10 weeks
04 — What Renovation Covers

More Than Paint. Real Rebuilding.

Renovation with DevPro means changing how a building performs, not just how it looks — so most of our jobs touch structure, services and finishes together. A cosmetic refresh is a decorator's job; what we take on is the work that needs an engineer in the room. Broadly, five kinds of project make up almost everything we do in the twin cities.

Structural repair & strengthening

Cracked or settling walls, a slab that has started to leak or sag, columns weakened by years of damp, or damage after a leak or minor seismic movement. We diagnose the cause first, then repair or strengthen — never patch over it. Structural work is where our PEC-registered engineers matter most, because getting a load path wrong is how a small problem becomes a dangerous one.

Additions & extensions

An extra floor, a rear or side extension, a servant block, a covered car porch, or extending a room out into the lawn. These tie new structure into an existing one, so the existing foundations and columns have to be checked for whether they can carry the added load before anything is designed. On CDA, RDA and society plots an addition usually needs fresh map approval too, and we build to what's approved rather than gambling it on site.

Full remodels

An older home taken back to its shell and rebuilt inside — new layout, new kitchen and bathrooms, re-plastered walls, fresh flooring, and completely replaced wiring and plumbing. This is our core renovation job in established Islamabad sectors, where the bones of the house are sound but the interior is thirty years behind how families live now.

Grey-to-finish takeovers

You have a grey structure — your own, or one you bought part-built — and you want it finished properly. We take it from bare shell to move-in: plaster, flooring and tiling, electrical and plumbing fixtures, kitchen, woodwork, paint and handover. Serene Villas in Blue World City is a real DevPro finishing project of exactly this type. Choosing your tier here is the big decision, and our guide to A-grade construction materials in Pakistan sets out what Economy, Premium and Deluxe actually buy.

Façade & envelope upgrades

New external finish, cladding or stonework, re-done boundary walls and gates, upgraded windows and external doors, and the waterproofing that protects all of it. A tired elevation can be transformed without touching the interior — and in the twin-cities climate, upgrading the envelope is also where you fix the seepage and heat problems an old façade was quietly causing.

05 — Assess Before You Commit

We Survey the Structure Before We Quote.

Every renovation starts with an honest condition survey of what's already there — because with an existing building, what you can't see decides the budget. A new build starts from bare ground with no surprises buried in it; a renovation inherits decades of someone else's decisions. So before we price anything, we look hard at four things.

Load-bearing and structural condition

We check which walls and columns actually carry load, look for cracks that signal settlement or overload, and assess the slab and beams — especially if you want to remove a wall, add a floor, or extend. In older twin-cities homes some internal walls are load-bearing masonry, not partitions, and knocking the wrong one through is a serious mistake. If you're adding weight on top, the existing foundations and columns get checked for capacity first.

Damp, seepage and waterproofing

Rising damp at the plinth, roof-slab leakage, bathroom seepage into adjoining rooms, and failed old waterproofing are the twin cities' most common hidden problems, thanks to the monsoon and years of neglected roofs. We trace damp to its source and fix that, rather than tiling over a wall that will bloom again after the next monsoon.

Electrical and plumbing age

Wiring and pipework in a twenty- or thirty-year-old home is often undersized for how a modern home loads it — more air-conditioning, more appliances, more bathrooms. Old aluminium wiring, undersized main cables, corroded galvanised pipe and low water pressure are things we plan to replace in a full remodel, not work around. It is far cheaper to re-wire and re-plumb while walls are already open than to go back into finished rooms later.

Compliance and what's approved

We check the sanctioned map against what's actually built, because unauthorised past additions can complicate a fresh approval when you extend or remodel. Where an addition needs the authority's sign-off — CDA, RDA, or the relevant society directorate — we flag it at survey stage so it's in the plan and the budget from day one.

Only after this survey do we put a number on the job. It's why a renovation quote takes a site visit, not a phone call — and why the site-visit and BOQ stage in our process exists before any tools come out.

06 — Renovate or Rebuild

When to Renovate, When to Rebuild.

Renovation makes sense when the structure is sound and the layout is workable; a full rebuild makes sense when the bones are failing or the plan can't be saved. It's the first honest conversation we have with a client, and sometimes the answer isn't the one they walked in expecting.

Renovate when

The structure is sound and the foundations, columns and slabs are in good shape; the layout mostly works and you're refreshing kitchens, bathrooms, flooring and services rather than moving every wall; you want to keep an approved, regularised property as it stands; and the emotional or practical value of staying put is real. Renovation is usually faster, cheaper and less disruptive than starting over — and it keeps a home you already like.

Rebuild when

The structure is compromised — serious settlement, failing slabs, damage beyond economic repair; you want a fundamentally different layout or significantly more covered area than the shell allows; or the cost of fixing everything wrong starts to approach what a new build would cost, at which point you're paying near-rebuild money for a compromised result. When renovation costs approach the cost of new construction, a fresh start often gives you more house for the money.

How do the numbers compare? A ground-up build in the twin cities runs roughly Rs. 6,650–8,800 per square foot combined grey-and-finishing (±8%, lower end on larger plots), with grey structure alone around Rs. 3,200–3,800. Renovation doesn't map cleanly onto a single per-sqft figure, because you're paying for demolition, making-good and selective replacement rather than a clean build — a gutted full remodel lands far higher per usable foot than a straightforward grey-to-finish takeover. That is why we price renovation per scope after an on-site survey rather than off a flat per-sqft rate — the condition of the existing structure is the single biggest variable, and a survey-based quote protects you from paying for guesswork. To sanity-check the rebuild side of the comparison, run your plot through our construction cost calculator or read the full house construction cost breakdown for Islamabad.

07 — How Renovation Is Costed

Why a Survey Sets the Price.

Renovation is priced from a site survey and a detailed scope, not from a flat per-square-foot rate card — because no two existing buildings hide the same problems. This is the single biggest difference between renovation and new-build costing, and it's worth understanding before you compare quotes.

A new house has clean, published economics: covered area multiplied by a rate you can look up, because the whole thing is being built the same way from scratch. A renovation is the opposite — the number is driven by what you're keeping, what you're demolishing, what you're replacing and what condition the survey uncovers. Two identical-looking houses on the same street can cost very differently to renovate: one has sound wiring and a dry roof, the other needs a full re-wire, roof waterproofing and a strengthened slab. A per-sqft card can't see that; a survey can.

The cost of a renovation is really the sum of distinct scopes — demolition and disposal, making-good of walls and surfaces, new services (electrical and plumbing), new finishes to your chosen tier, and any structural strengthening or extension. Each is quantified in the BOQ so you can see where the money goes and adjust scope up or down. As a rough tier reference for the finishing portion, DevPro's finishing bands run about Rs. 3,450–3,700 per sqft at Economy, Rs. 3,600–4,200 at Premium and Rs. 3,850–5,000 at Deluxe — useful for the parts of a renovation that are effectively new finishing, though renovation adds the demolition and making-good a new build never incurs. That is exactly why the firm figure comes from a scoped, survey-based quote rather than a headline per-sqft rate — we measure the real condition of your structure first, then price the work it actually needs.

What this means for you is simple: be wary of anyone who quotes a renovation over the phone from a covered-area figure alone. A real renovation price comes after someone has walked the property, opened up the unknowns where needed, and written a scope. That's the number that won't move on you halfway through — and it's the only way we quote. You can still anchor a rough budget for the new-finishing parts through our cost calculator.

08 — Phasing & Local Scenarios

Living Through It, Twin-Cities Realities.

Many families want to keep living in the home while it's renovated — that's doable for partial work if it's phased properly, and usually not worth it for a full gut. How you sequence the job matters as much as what you spend on it.

Phasing while you live in

For a single kitchen or a bathroom overhaul, staying put is normally fine — we work in a dust-controlled zone, seal off the area, and keep the rest of the house usable. For a full home remodel that opens up wiring, plumbing and flooring across every room, we recommend vacating: it's faster, cleaner and safer, and it lets trades run in parallel instead of tiptoeing around an occupied house. Where a client must stay, we can phase the work floor by floor or wing by wing — you lose some speed and pay a little more for the disruption of working around you, but it's a real option. We agree the sequence up front so you always know which rooms are live that week.

Older F- and E-sector Islamabad homes

The established sectors are full of solidly built houses from the 1980s and 90s with generous plots and dated interiors. These are ideal full-remodel candidates: the structure is usually sound, so the work is a new layout, new kitchen and bathrooms, complete re-wiring and re-plumbing, and fresh finishes — transforming how the house lives without touching what makes it stand. Damp and old services are the usual surprises the survey turns up.

DHA & Bahria upgrades

Newer societies like DHA Islamabad-Rawalpindi and Bahria Town bring a different job: houses only ten or fifteen years old where owners want to modernise a kitchen, upgrade bathrooms to a higher tier, add a floor or a room, or refresh a façade. The structure is rarely the issue here — it's a finishing and additions job, often stepping up a tier. Additions in these societies typically need the relevant directorate's approval, which we handle as part of scope. Whichever society you're in, the process is the same: we survey, scope, quote from what we find, and give you the one-year written warranty on the work.

09 — The Process

How Renovations Actually Run.

1
Step 1

Assessment & Scope

Site visit, full condition survey, scope agreement and a transparent Bill of Quantities — at no cost.

2
Step 2

Design & Selection

Material selection, finish choices, fixture and fittings approval. Everything signed off before tools come out.

3
Step 3

Renovation & Updates

Daily WhatsApp photo updates. Minimal disruption, dust-controlled work zones, clean execution.

4
Step 4

Handover

Snag clearance, deep clean, and a 1-year defect warranty in writing. Walk back in and use the space.

11 — Free Consultation

Ready to Transform Your Space?

Tell us about the space and our team will call you within 2 hours.

Project Details

2-Hour Response
Our team will call you within 2 hours.
12 — FAQ

Renovation
Questions.

Quick answers to the questions our renovation clients ask first.

Still have questions?
Chat With Us

Minimum project value is Rs. 25 Lakh. We handle complete renovation projects, not small repairs.

A full home renovation typically takes 2–4 months depending on scope. Kitchen or bathroom renovations take 3–6 weeks.

For full home renovations we recommend vacating. For partial renovations like a single kitchen or bathroom, staying is usually possible.

Yes — we source and procure all materials, saving you time and ensuring quality consistency throughout the project.

Chat for Quick Quote Call Now — 0333-0034500